Metal Building for Easthampton, Massachusetts Build and Buy Online!
Trim and GutterThe trim on a steel building serves two essential functions, to close transitions and protect the building from the weather. Trim also adds to the appearance of a building. Our sculptured trim gives the building a refined, quality appearance. Trim covers corner and edge areas of a building. For instance, eave trim creates a transition from the roof to the sidewalls and roof to endwalls. Most metal building companies often supply "box" or generic trim pieces. This trim routinely has to be modified to fit, as it is created as multi-purpose - and does not fit well on standard panels. We fabricate each profile to match the design of your steel building. We do a lot of work in the shop that will save you headaches in the field. We hem all exposed edges of our trim so it installs easily, fits neatly, and looks great for the life of your building. Our trim is easy to install and adds to the look and the integrity of the building. Roof PitchThe angle of a steel building's roof is determined by roof pitch. Roof pitch indicates the rise vertically for every 12 inches of travel horizontally. Our online system allows you to choose up to a 6:12 pitch. There are many considerations with both higher and lower roof pitches. Higher pitched roofs may add to the cost of the building, but can add performance to a building in a heavy snow region. Additionally, you can take advantage of extra space above. High-pitched roofs are less likely to leak and can add style to your building. Low-pitched roofs require less material and therefore cost less. Also it is easier to heat and cool a building with a low-pitched roof. One major advantage of a low-pitched roof is expandability. If you ever add-on to your building you will be able to add more space while keeping the loss of headroom to a minimum. Steel Storage BuildingsSome people might not fully appreciate their need for a steel storage building. Think about all the prized possessions, and family heirlooms you are storing in the garage or attic - or even worse - paying high storage fees. There is a far more economical way to store all of your possessions. Whether you are looking to build a storage building for commercial or business use or a simple steel storage building for personal use - you cannot make a wiser choice than with a steel building system. The sturdy metal frame system makes steel storage buildings structurally superior. Pre-engineered steel buildings offer reliable protection to your investments. As with all products, not every manufacturer utilizes high quality materials. Look for a company that explains its materials and its use. Be sure to ask questions about steel storage buildings before you buy, any manufacturer will be happy to address any concerns. Visible CondensationTo effectively control visible condensation, it is necessary to reduce the cold surface areas where condensation may occur. It is also important to minimize the air moisture content within a building through the use of properly designed ventilating systems. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thank you for visiting Metal Building for Easthampton, Massachusetts. We provide the best service and prices when shopping for metal buildings or steel buildings. |