Metal Building for Showell, Maryland Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Before you BuyDo you know the company you're doing business with? Is the supplier a member of the Better Business Bureau? Do they have a record of dealing honestly? Can they refer you to satisfied customers? Is the physical address to the company available? Can you visit them at their offices? Are they a real company with a history of quality manufacturing? Are they Active Members of the AISC (American Institute of Steel Construction) Do they post any affiliation with any steel building association? Do you know what you are paying for? Does the steel building contract give line-item prices? Will you receive comprehensive set of erection plans? Are you getting written 30-year paint and 25-year Galvalume Plus® warranties? Does the contract specify 26 gauge panels? Does their roof panels include a "purlin bearing" leg? Does the roof system have an Underwriters Laboratories Class 90 rating? Are you being supplied with premium fasteners with a lifetime red-rust warranty? Will your steel building have a sculptured trim package? Are all the clips welded to primary structural components? Are the framed openings factory located? Does the supplier have the ability to engineer a custom design? Will you receive an 80+ page fully illustrated erection manual? Does the supplier have an in-house customer service department? Does the supplier actually manufacture what they sell? Do they process and produce all their drawings in-house? Do they ask you to sign a contract and pay a deposit before you know the total cost? Metal Storage BuildingsMetal storage buildings have multiple advantages over wood framed buildings. The upkeep required to maintain wood structures is not an issue with pre engineered steel buildings. Make an investment that will work for you for a lifetime with robust metal storage buildings. A concern with any building is its ability to maintain an acceptable appearance over years. Wooden buildings need repainting and resealing. Metal buildings, rust resistant, and require far less maintenance than conventional structures. Wooden buildings are susceptible to rotting, insects and leaking. If you are storing equipment, livestock or anything of value, these elements are harmful to a conventional structure. Save yourself time and anguish by investing in metal storage buildings with a steel framework and a heavy insulation package. Misleading Information - Deceptive PracticesThe standards and values of our industry are regularly masked by the deceptive practices of the unprincipled few. These companies deliberately mislead people hoping to increase their chances of a sale. At Metal Building Depot we know that the more you understand about the product you are buying, the more confidant you will be at purchase time. Arm yourself with information - No manufacturer keeps an inventory of buildings "ready to ship." Without exception, steel buildings are made specifically to order. A building should be designed to meet your needs and more importantly - your building code. Some companies create "general" price lists for common sizes, but the selection is very limited to a geographic area with limited variance in design. Beware of companies implying they keep an existing inventory of buildings. To find out whether a "clearance" or "cancelled order" really exists inquire on the earliest ship date. You should be able to take immediate delivery on a building "ready to ship." There is no such thing as making simple structural changes on a pre-designed building. Moving or adding a door opening on an existing or "ready to ship" building - could require the use of a wind column or portal frame. This could change the rigid frame design and render the existing design useless. Additionally, changing the wind or snow load could require the girt and purlin spacing to change and the location of connection plates along columns and rafters may not be located properly. The bottom line is that a structural change most likely requires a new building design. The moral of this story is: If a seller claims to have a building "ready to ship" make sure it will meet or exceed you local building codes and loads and more importantly - your needs. Proposal or Propose "ALL" - We want to help you eliminate the "gray areas" in a typical building quote. The items listed on your contract should be made clear as to exactly what is being promised. Our itemized contracts are detailed and specific and you'll never see "included" in one price (without a description). All your accessories and options are listed as separate line items. With our online quote you will always know exactly what you're paying for. Thank you for visiting Metal Building for Showell, Maryland. We provide the best service and prices when shopping for metal buildings or steel buildings. |