Metal Building for Vincent, Kentucky Build and Buy Online!
Visible CondensationTo effectively control visible condensation, it is necessary to reduce the cold surface areas where condensation may occur. It is also important to minimize the air moisture content within a building through the use of properly designed ventilating systems. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. On The FarmI don't know of any farm operation that could get buy without barns for equipment storage, feed storage or any other general warehousing needs. Many older farms are now removing old wooden structures and replacing their old buildings with new steel structures. While the old antique tractor may look good in front of the old barn, many are weary of storing precious items in an old rotten structure. Steel is stronger, straighter and will last eons longer than wood. In a home, wood is fine. Houses are designed so that the wooden structural components do not have direct exposure to the elements, but on the farm it is often hard to prevent the outside from coming into the barn. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Thank you for visiting Metal Building for Vincent, Kentucky. We provide the best service and prices when shopping for metal buildings or steel buildings. |