Metal Building for Summer Shade, Kentucky Build and Buy Online!
Surface Air Film Coefficient (F) The amount of heat flow in BTU's per square foot per hour between an exposed surface of a material and the adjacent air. It is the measure of the conductance of heat through the air film that clings to all surfaces. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. When you decide to buy a BuildingConfirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Pre Engineered Steel BuildingsGrowth is good for every business. It can also be overwhelming when facilities, staff and production seem to be bursting at capacity. By adding needed space, it is possible to alleviate pressure by providing the appropriate workspace to achieve the greatest efficiency. Something that makes pre engineered steel buildings and steel storage buildings attractive to buyers is the flexibility of the external and internal floor plan. Every site has constraints that a conventional builder may be reluctant to work around, but metal buildings can be built to suit any site requirements. There should be no reason not to consider a pre-engineered steel building for your construction solution. Steel buildings provide comfort and amenities equal or greater than conventional construction methods. If you are renting office space, and considering building your own complex, you can instantly realize the benefits of owning a steel building. Thank you for visiting Metal Building for Summer Shade, Kentucky. We provide the best service and prices when shopping for metal buildings or steel buildings. |