Metal Building for Hope, Kentucky Build and Buy Online!
Steel BuildingsWhy should I build with steel instead of wood? - The number one reason is strength. Steel buildings can withstand high load conditions. Steel buildings are fastened together with high-strength bolts and screws. The connections remain secure because there is little to no movement in the structural members and panels. However, wood connections in conventional construction become loose due to expansion and contraction and the result is warping of the wooden frame. Steel does not warp, shrink, or change with time so the connections remain secure. Wooden buildings can suffer damage do to insects such as termites, and this deterioration will reduce the quality of wooden buildings. Furthermore, metal building material is not a flammable substance so your insurance costs will be reduced. How does the price of a steel building compare with others? - Conventional construction materials are affected by demand and availability; conversely, steel has remained relatively constant for many years. When it comes to pre-fabricated steel buildings it would be difficult to find a like structure to compare with the low cost of a steel building. Is everything I need to construct my building included? - Everything you need to construct your new metal building will be included with the exception of the anchor bolts, which should be supplied by your foundation contractor. What is Bay Spacing? - It is the space between 2 frames. For example, the end wall of the building is the End-Frame, and the distance between the End-Frame and the next column/rafter section is the Bay Space, or the distance between two column/rafter sections. How do I assemble my steel building? - Steel building assembly couldn't be easier. We provide you with the necessary information to erect your steel building quickly and efficiently. Many of our clients erect their steel buildings on their own, although a professional contractor can also used at an affordable price. Are the steel buildings painted? - Yes, the walls and trim are painted with a long-lasting factory-applied paint manufactured by a leading manufacturer of heavy duty, high performance protective coatings for steel building components. There is a wide selection of colors for you to choose from. You can select the wall panel, trim, and roof colors on the color chart section of our website. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. Ceiling & Wall Liners29g low rib panel applied to the interior of the building providing a clean protective covering over insulation or girt/purlin cavity. Thank you for visiting Metal Building for Hope, Kentucky. We provide the best service and prices when shopping for metal buildings or steel buildings. |