Metal Building for Whiting, Kansas Build and Buy Online!
Thermal Conductivity (K-Value)A unit used to express the amount of heat, in BTU's per hour, that passes through one square foot of homogeneous material that is exactly one inch thick and has a temperature difference of one degree Fahrenheit between its surfaces. As the K-Value decreases, so does the amount of heat permitted to pass through the material. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Misleading Information - Deceptive PracticesThe standards and values of our industry are regularly masked by the deceptive practices of the unprincipled few. These companies deliberately mislead people hoping to increase their chances of a sale. At Metal Building Depot we know that the more you understand about the product you are buying, the more confidant you will be at purchase time. Arm yourself with information - No manufacturer keeps an inventory of buildings "ready to ship." Without exception, steel buildings are made specifically to order. A building should be designed to meet your needs and more importantly - your building code. Some companies create "general" price lists for common sizes, but the selection is very limited to a geographic area with limited variance in design. Beware of companies implying they keep an existing inventory of buildings. To find out whether a "clearance" or "cancelled order" really exists inquire on the earliest ship date. You should be able to take immediate delivery on a building "ready to ship." There is no such thing as making simple structural changes on a pre-designed building. Moving or adding a door opening on an existing or "ready to ship" building - could require the use of a wind column or portal frame. This could change the rigid frame design and render the existing design useless. Additionally, changing the wind or snow load could require the girt and purlin spacing to change and the location of connection plates along columns and rafters may not be located properly. The bottom line is that a structural change most likely requires a new building design. The moral of this story is: If a seller claims to have a building "ready to ship" make sure it will meet or exceed you local building codes and loads and more importantly - your needs. Proposal or Propose "ALL" - We want to help you eliminate the "gray areas" in a typical building quote. The items listed on your contract should be made clear as to exactly what is being promised. Our itemized contracts are detailed and specific and you'll never see "included" in one price (without a description). All your accessories and options are listed as separate line items. With our online quote you will always know exactly what you're paying for. Thank you for visiting Metal Building for Whiting, Kansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |