Metal Building for Richmond, Kansas Build and Buy Online!
Thermal Conductance (C-Value)A measure of the amount of heat that passes through materials of any thickness. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Other Metal Building DetailsFasteners: Self-drilling fasteners are designed for rapid drilling without slipping of the drill point, thus reducing walking and surface marring. The neoprene washer keeps your building watertight as well as providing vibration dampening. Structural Bolts: We provide all the nuts and bolts to assemble your building through pre-punched holes. Closure Strips: Our Steel Buildings come with closure strips which when installed provide weather tightness. The closure strips are pre-formed to match the profile of the panels. Ridge Cap: The ridge cap is designed to match the slope and contour of the roof providing a tight seal along the ridge of the building. Trim, Flashing, Gutters & Downspouts: All our buildings come with standard trim to give the building a finished clean look. Optional Gutters and Downspouts provide additional protection from the elements. Plans and Drawings: We provide a full set of anchor bolt plans for the placement of anchor bolts in the foundation. We also provide engineered stamped and certified construction prints. In addition we provide an in depth erection manual to walk you through the erection of your building. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Pre Engineered Steel BuildingsGrowth is good for every business. It can also be overwhelming when facilities, staff and production seem to be bursting at capacity. By adding needed space, it is possible to alleviate pressure by providing the appropriate workspace to achieve the greatest efficiency. Something that makes pre engineered steel buildings and steel storage buildings attractive to buyers is the flexibility of the external and internal floor plan. Every site has constraints that a conventional builder may be reluctant to work around, but metal buildings can be built to suit any site requirements. There should be no reason not to consider a pre-engineered steel building for your construction solution. Steel buildings provide comfort and amenities equal or greater than conventional construction methods. If you are renting office space, and considering building your own complex, you can instantly realize the benefits of owning a steel building. Thank you for visiting Metal Building for Richmond, Kansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |