Metal Building for Hoisington, Kansas Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Metal Building KitPurchasing your new metal building kit. You should be cautious when buying a metal building kit. Not every manufacturer uses high quality materials or fabricates to the latest industry standards. You don't want to purchase a building from a manufacturer (or broker) whose building parts were produced in a factory without the benefit of a skilled eye to oversee the process. A pre-engineered metal building should come with a complete and comprehensive set of blueprints. When a qualified steel building manufacturer puts its seal of approval on your building design you can rest assured of its structural integrity. You can expect detailed documentation about the building's fabrication and its specific code requirements as well. Before you purchase a metal building kit you should attempt to create a basic plan for its end use and design. Working with a professional steel building company should ensure that all facets of your building are taken into consideration. They can explain the building options and codes in detail so you have the accurate building specifications. Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Thank you for visiting Metal Building for Hoisington, Kansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |