Metal Building for South English, Iowa Build and Buy Online!
SheetingAll sheeting is 26-gauge "R" panel. Color sheeting has a galvanized substrate to prevent rust and corrosion. All our Galvalume roof sheeting is hot dipped with a zinc and Aluminum compound to give it the strength to stand up to the worst weather, and the durability to last for generations. Gutters & DownspoutsThese are generally not required on steel buildings. However, use of these components often enhances the appearance of a building, control drip, splash and drainage. Gutters and downspouts are an optional accessory that serves as trim. Gutters dramatically improve the appearance of buildings, and we recommend them for most building applications. Downspouts control the water falling from the roof, preventing the water from splashing up on the sides of the building. On every Metal Building Depot building, die-formed ridge caps are used to cover the peak opening in the center ridge of the building. Some sellers provide a ridge roll cover that must be sealed with closures. Installing ridge roll trim is not an easy task. Over time the exposed foam closures deteriorate and there can be potential leak problems. Our die-formed ridge caps match the panel profile perfectly and are formed to fit the pitch of the roof. Die-formed ridge caps create an almost seamless transition across the roof. Before you BuyDo you know the company you're doing business with? Is the supplier a member of the Better Business Bureau? Do they have a record of dealing honestly? Can they refer you to satisfied customers? Is the physical address to the company available? Can you visit them at their offices? Are they a real company with a history of quality manufacturing? Are they Active Members of the AISC (American Institute of Steel Construction) Do they post any affiliation with any steel building association? Do you know what you are paying for? Does the steel building contract give line-item prices? Will you receive comprehensive set of erection plans? Are you getting written 30-year paint and 25-year Galvalume Plus® warranties? Does the contract specify 26 gauge panels? Does their roof panels include a "purlin bearing" leg? Does the roof system have an Underwriters Laboratories Class 90 rating? Are you being supplied with premium fasteners with a lifetime red-rust warranty? Will your steel building have a sculptured trim package? Are all the clips welded to primary structural components? Are the framed openings factory located? Does the supplier have the ability to engineer a custom design? Will you receive an 80+ page fully illustrated erection manual? Does the supplier have an in-house customer service department? Does the supplier actually manufacture what they sell? Do they process and produce all their drawings in-house? Do they ask you to sign a contract and pay a deposit before you know the total cost? Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Thank you for visiting Metal Building for South English, Iowa. We provide the best service and prices when shopping for metal buildings or steel buildings. |