Metal Building for New Liberty, Iowa Build and Buy Online!
Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. Misleading Information - Deceptive PracticesThe standards and values of our industry are regularly masked by the deceptive practices of the unprincipled few. These companies deliberately mislead people hoping to increase their chances of a sale. At Metal Building Depot we know that the more you understand about the product you are buying, the more confidant you will be at purchase time. Arm yourself with information - No manufacturer keeps an inventory of buildings "ready to ship." Without exception, steel buildings are made specifically to order. A building should be designed to meet your needs and more importantly - your building code. Some companies create "general" price lists for common sizes, but the selection is very limited to a geographic area with limited variance in design. Beware of companies implying they keep an existing inventory of buildings. To find out whether a "clearance" or "cancelled order" really exists inquire on the earliest ship date. You should be able to take immediate delivery on a building "ready to ship." There is no such thing as making simple structural changes on a pre-designed building. Moving or adding a door opening on an existing or "ready to ship" building - could require the use of a wind column or portal frame. This could change the rigid frame design and render the existing design useless. Additionally, changing the wind or snow load could require the girt and purlin spacing to change and the location of connection plates along columns and rafters may not be located properly. The bottom line is that a structural change most likely requires a new building design. The moral of this story is: If a seller claims to have a building "ready to ship" make sure it will meet or exceed you local building codes and loads and more importantly - your needs. Proposal or Propose "ALL" - We want to help you eliminate the "gray areas" in a typical building quote. The items listed on your contract should be made clear as to exactly what is being promised. Our itemized contracts are detailed and specific and you'll never see "included" in one price (without a description). All your accessories and options are listed as separate line items. With our online quote you will always know exactly what you're paying for. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. Thank you for visiting Metal Building for New Liberty, Iowa. We provide the best service and prices when shopping for metal buildings or steel buildings. |