Metal Building for Lawler, Iowa Build and Buy Online!
Other Metal Building DetailsFasteners: Self-drilling fasteners are designed for rapid drilling without slipping of the drill point, thus reducing walking and surface marring. The neoprene washer keeps your building watertight as well as providing vibration dampening. Structural Bolts: We provide all the nuts and bolts to assemble your building through pre-punched holes. Closure Strips: Our Steel Buildings come with closure strips which when installed provide weather tightness. The closure strips are pre-formed to match the profile of the panels. Ridge Cap: The ridge cap is designed to match the slope and contour of the roof providing a tight seal along the ridge of the building. Trim, Flashing, Gutters & Downspouts: All our buildings come with standard trim to give the building a finished clean look. Optional Gutters and Downspouts provide additional protection from the elements. Plans and Drawings: We provide a full set of anchor bolt plans for the placement of anchor bolts in the foundation. We also provide engineered stamped and certified construction prints. In addition we provide an in depth erection manual to walk you through the erection of your building. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. ABOUT USCOMMITMENT - Our Company's vision is "to maintain a leading-edge in the design, engineering, fabrication and delivery of the highest quality steel buildings in the industry." We are deeply committed to providing you with this service as a means of achieving our vision. VALUE - Low initial cost does not always provide the best value. It is just a small part of the picture. The values inherent in our designs assist in the ease of construction of the project but more importantly we provide a well-documented system that is easy to maintain. Much of the value we bring lies in the details. There is a true ART to engineering and design that provides added value to the Owner. EXPERIENCE - With over 8 years in the manufacturing business and key staff members with many more years in engineering, we have the requisite experience. Major hardware and accessory suppliers have reviewed our capabilities and recognize us as leaders in our field. Many of our projects involve very difficult project constraints. Dealing with these issues and tight project schedules is the trademark of our success. PROJECT METHODOLOGY - The success of a project lies in the talent of the design team and in the execution of the project. We first provide a strong project team, backed up with a well-defined and proven project execution methodology. Our project methodology has evolved over the years as we have executed numerous projects. It begins with our proposal document and extends through project documents, design sequence, system testing, acceptance documents and to the final delivery of our building system. The key to our methodology is communication. We strongly believe in defining what we are providing and expanding this initial definition as the project continues. QUALITY - In engineering, quality relates to the designs we produce and the timing in project execution. Our goal for design is to provide a superior level of detail in documentation. We strive for uniformity of design, providing details often left out by others and keeping systems simple. The key to being on time is project execution. First, a well-defined project methodology is needed to set the planning framework. Second, understanding of the Owner's needs is paramount. Finally, our years of experience in the execution of critical projects have given us an essential edge over our competitors. Key members of our staff have up to thirty-five years of experience in project engineering and execution. Steel BuildingsWhy should I build with steel instead of wood? - The number one reason is strength. Steel buildings can withstand high load conditions. Steel buildings are fastened together with high-strength bolts and screws. The connections remain secure because there is little to no movement in the structural members and panels. However, wood connections in conventional construction become loose due to expansion and contraction and the result is warping of the wooden frame. Steel does not warp, shrink, or change with time so the connections remain secure. Wooden buildings can suffer damage do to insects such as termites, and this deterioration will reduce the quality of wooden buildings. Furthermore, metal building material is not a flammable substance so your insurance costs will be reduced. How does the price of a steel building compare with others? - Conventional construction materials are affected by demand and availability; conversely, steel has remained relatively constant for many years. When it comes to pre-fabricated steel buildings it would be difficult to find a like structure to compare with the low cost of a steel building. Is everything I need to construct my building included? - Everything you need to construct your new metal building will be included with the exception of the anchor bolts, which should be supplied by your foundation contractor. What is Bay Spacing? - It is the space between 2 frames. For example, the end wall of the building is the End-Frame, and the distance between the End-Frame and the next column/rafter section is the Bay Space, or the distance between two column/rafter sections. How do I assemble my steel building? - Steel building assembly couldn't be easier. We provide you with the necessary information to erect your steel building quickly and efficiently. Many of our clients erect their steel buildings on their own, although a professional contractor can also used at an affordable price. Are the steel buildings painted? - Yes, the walls and trim are painted with a long-lasting factory-applied paint manufactured by a leading manufacturer of heavy duty, high performance protective coatings for steel building components. There is a wide selection of colors for you to choose from. You can select the wall panel, trim, and roof colors on the color chart section of our website. Thank you for visiting Metal Building for Lawler, Iowa. We provide the best service and prices when shopping for metal buildings or steel buildings. |