Metal Building for Clemons, Iowa Build and Buy Online!
FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Ceiling & Wall Liners29g low rib panel applied to the interior of the building providing a clean protective covering over insulation or girt/purlin cavity. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Frame TypesUnlike any of our competitors, we allow you to price all building frame types. Select from Clear-span or Modular rigid-frame buildings. We allow you the full flexibility to choose Gable, Single Sloped or Offset Peak building shape. By far, we offer the widest selection of building and frame types. For options not available through the online system, you will need to request a special quote. Clear-span Frames - A clear-span rigid frame offers strength and economy. Since no interior supports are necessary, this design is best when you require large areas of clear and uninterrupted space. Factories, warehouses and agricultural buildings are just a few building types that may utilize a clear-span frame building. A clear-span design does have size limitations. As the desired width increases, the frames will become larger and heavier to carry greater loads across the length of the frame. At some point the cost will outweigh the benefit. Even so, clear-span buildings are still effective for buildings as wide as 150' feet and wider in some cases. Modular Frames - Modular frames use interior columns to evenly distribute the load; reducing the cost of both the frame and foundation of extra wide buildings. The economical advantages become obvious when a building width is about 100' wide or wider. As a result, almost all buildings 100' wide or wider have interior support columns. Modular designs are often used for large factories and warehouses. Single Slope Frames - Single slope frames have high and low eave heights creating a roof that "slopes" from side to side. To select a single slope design, you specify one eave height and define the roof pitch. Single slope designs are frequently used for strip shopping centers, offices, and RV/Boat storage facilities. Just about every steel building has at least one framed opening. It is not unusual for buildings to have several openings. Most openings are created for an overhead door, but can be used for the installation of glass fronts or other entries. Most other online sellers offer "field located" framed openings, which require cutting and fabricating on the job site. Metal Building Depot always provides factory-located openings unless your project requires something otherwise. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Clemons, Iowa. We provide the best service and prices when shopping for metal buildings or steel buildings. |