Metal Building for Charter Oak, Iowa Build and Buy Online!
Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Concealed CondensationConcealed condensation is the most difficult to deal with and can be the most damaging to any kind of structure. This type of condensation may be controlled in metal buildings by the proper ventilation. Additional condensation control can be accomplished by venting the cold cavities of the walls and roof. Before you BuyDo you know the company you're doing business with? Is the supplier a member of the Better Business Bureau? Do they have a record of dealing honestly? Can they refer you to satisfied customers? Is the physical address to the company available? Can you visit them at their offices? Are they a real company with a history of quality manufacturing? Are they Active Members of the AISC (American Institute of Steel Construction) Do they post any affiliation with any steel building association? Do you know what you are paying for? Does the steel building contract give line-item prices? Will you receive comprehensive set of erection plans? Are you getting written 30-year paint and 25-year Galvalume Plus® warranties? Does the contract specify 26 gauge panels? Does their roof panels include a "purlin bearing" leg? Does the roof system have an Underwriters Laboratories Class 90 rating? Are you being supplied with premium fasteners with a lifetime red-rust warranty? Will your steel building have a sculptured trim package? Are all the clips welded to primary structural components? Are the framed openings factory located? Does the supplier have the ability to engineer a custom design? Will you receive an 80+ page fully illustrated erection manual? Does the supplier have an in-house customer service department? Does the supplier actually manufacture what they sell? Do they process and produce all their drawings in-house? Do they ask you to sign a contract and pay a deposit before you know the total cost? Concealed CondensationConcealed condensation is the most difficult to deal with and can be the most damaging to any kind of structure. This type of condensation may be controlled in metal buildings by the proper ventilation. Additional condensation control can be accomplished by venting the cold cavities of the walls and roof. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Thank you for visiting Metal Building for Charter Oak, Iowa. We provide the best service and prices when shopping for metal buildings or steel buildings. |