Metal Building for Center Junction, Iowa Build and Buy Online!
Roof PitchThe angle of a steel building's roof is determined by roof pitch. Roof pitch indicates the rise vertically for every 12 inches of travel horizontally. Our online system allows you to choose up to a 6:12 pitch. There are many considerations with both higher and lower roof pitches. Higher pitched roofs may add to the cost of the building, but can add performance to a building in a heavy snow region. Additionally, you can take advantage of extra space above. High-pitched roofs are less likely to leak and can add style to your building. Low-pitched roofs require less material and therefore cost less. Also it is easier to heat and cool a building with a low-pitched roof. One major advantage of a low-pitched roof is expandability. If you ever add-on to your building you will be able to add more space while keeping the loss of headroom to a minimum. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. Steel BuildingsWhy should I build with steel instead of wood? - The number one reason is strength. Steel buildings can withstand high load conditions. Steel buildings are fastened together with high-strength bolts and screws. The connections remain secure because there is little to no movement in the structural members and panels. However, wood connections in conventional construction become loose due to expansion and contraction and the result is warping of the wooden frame. Steel does not warp, shrink, or change with time so the connections remain secure. Wooden buildings can suffer damage do to insects such as termites, and this deterioration will reduce the quality of wooden buildings. Furthermore, metal building material is not a flammable substance so your insurance costs will be reduced. How does the price of a steel building compare with others? - Conventional construction materials are affected by demand and availability; conversely, steel has remained relatively constant for many years. When it comes to pre-fabricated steel buildings it would be difficult to find a like structure to compare with the low cost of a steel building. Is everything I need to construct my building included? - Everything you need to construct your new metal building will be included with the exception of the anchor bolts, which should be supplied by your foundation contractor. What is Bay Spacing? - It is the space between 2 frames. For example, the end wall of the building is the End-Frame, and the distance between the End-Frame and the next column/rafter section is the Bay Space, or the distance between two column/rafter sections. How do I assemble my steel building? - Steel building assembly couldn't be easier. We provide you with the necessary information to erect your steel building quickly and efficiently. Many of our clients erect their steel buildings on their own, although a professional contractor can also used at an affordable price. Are the steel buildings painted? - Yes, the walls and trim are painted with a long-lasting factory-applied paint manufactured by a leading manufacturer of heavy duty, high performance protective coatings for steel building components. There is a wide selection of colors for you to choose from. You can select the wall panel, trim, and roof colors on the color chart section of our website. Pre Engineered Metal BuildingsDeciding to use a pre-engineered metal building is a wise choice. But, there is important information you will need to provide to the manufacturer in order to have your new steel building to be designed to precise specifications. Understanding your building needs and restrictions can help when you consult with a steel building manufacturer. A few questions you need to ask yourself once you decide to buy a metal building system. What are my size limitations? What will the building be used for? What special building requirements are needed? Why the answers to these questions are so critical is that they expose precisely what kind of pre-engineered building system will satisfy your needs. Metal church buildings have very different structural demands than those of mini storage buildings. If investing money into a pre engineered metal building system it only makes sense to research all options. Perplexed about where to start? Contact a manufacturer; they will ask you the right questions to get what information they need to suitably determine your building needs. They can also help you review your requirements to equip your structure with the appropriate interior and exterior features. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Thank you for visiting Metal Building for Center Junction, Iowa. We provide the best service and prices when shopping for metal buildings or steel buildings. |