Metal Building for Williamsburg, Indiana Build and Buy Online!
Panel ProfilesRoof Panel Profiles - Our standard roof sheeting is the "PBR" panel, which is available in bare Galvalume Plus® as well as a variety of colors. Wall sheeting is available in "R" and "PBR" panel. Depending on the color and your geographic location - PBR panels may not be available for certain colors. Liner Panels - For liner panels we offer a low-rib 29-gauge panel. Liner panels are an interior covering for the walls of a steel building. Like exterior walls, liner panel consists of 3-foot wide panels that are attached to the framing in the same manner as exterior sheeting. Full-height liners run from floor to roof. Partial-height liners typically attach to the girt at 7'4" and extend a few inches above it. Buildings with liner panels must have a base connection for the bottom of the panel (see base conditions). Advantages - Liner Panels enhance appearance, providing a finished look for the interior. The biggest advantage is that liners protect the insulation and the outside walls. Because un-reinforced insulation facings tear easily, and even the best-reinforced materials can be damaged, liner panels are the intelligent solution to protect your investment. Although 26-gauge exterior walls can withstand a lot of punishment, a steel liner will protect your building's interior and performs at a lower cost than other wall coverings, which will require their own framing. Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Insulating Against Radiant Heat Traditional forms of mass insulation, like fiberglass, are effective in preventing heat transfer by conduction and convection, but they less effect on radiant heat. Between 80 and 90% of the radiant heat striking fiberglass will pass through or be "emitted". Radiant transfer typically has as much impact on the temperature in a building as conduction and convection. For more information on radiant barrier facings click here. When you decide to buy a BuildingConfirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Thank you for visiting Metal Building for Williamsburg, Indiana. We provide the best service and prices when shopping for metal buildings or steel buildings. |