Metal Building for Stanford, Indiana Build and Buy Online!
Surface Air Film Coefficient (F) The amount of heat flow in BTU's per square foot per hour between an exposed surface of a material and the adjacent air. It is the measure of the conductance of heat through the air film that clings to all surfaces. Metal Storage BuildingsMetal storage buildings have multiple advantages over wood framed buildings. The upkeep required to maintain wood structures is not an issue with pre engineered steel buildings. Make an investment that will work for you for a lifetime with robust metal storage buildings. A concern with any building is its ability to maintain an acceptable appearance over years. Wooden buildings need repainting and resealing. Metal buildings, rust resistant, and require far less maintenance than conventional structures. Wooden buildings are susceptible to rotting, insects and leaking. If you are storing equipment, livestock or anything of value, these elements are harmful to a conventional structure. Save yourself time and anguish by investing in metal storage buildings with a steel framework and a heavy insulation package. Engineered BuildingsDon't be reluctant to purchase an engineered building because you think that it will limit your options. There are unlimited building styles and configurations to choose from. A person needing a metal church building will most likely want a different construction style than someone looking to erect a steel building horse barn. For this reason, engineered buildings are as diverse as the purposes they are used. If you require assistance in addressing your particular needs and specifications many steel building manufacturers offer design services to walk you through the process, some even offer online design programs. Most pre engineered metal building manufacturers will have a common design that suits your needs, but never hesitate to ask for custom designed plans. A qualified manufacturer should make no hesitation in designing the exact building you desire. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Thank you for visiting Metal Building for Stanford, Indiana. We provide the best service and prices when shopping for metal buildings or steel buildings. |