Metal Building for New Point, Indiana Build and Buy Online!
Surface Air Film Coefficient (F) The amount of heat flow in BTU's per square foot per hour between an exposed surface of a material and the adjacent air. It is the measure of the conductance of heat through the air film that clings to all surfaces. Pre Engineered Metal BuildingsDeciding to use a pre-engineered metal building is a wise choice. But, there is important information you will need to provide to the manufacturer in order to have your new steel building to be designed to precise specifications. Understanding your building needs and restrictions can help when you consult with a steel building manufacturer. A few questions you need to ask yourself once you decide to buy a metal building system. What are my size limitations? What will the building be used for? What special building requirements are needed? Why the answers to these questions are so critical is that they expose precisely what kind of pre-engineered building system will satisfy your needs. Metal church buildings have very different structural demands than those of mini storage buildings. If investing money into a pre engineered metal building system it only makes sense to research all options. Perplexed about where to start? Contact a manufacturer; they will ask you the right questions to get what information they need to suitably determine your building needs. They can also help you review your requirements to equip your structure with the appropriate interior and exterior features. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. When you decide to buy a BuildingConfirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Thank you for visiting Metal Building for New Point, Indiana. We provide the best service and prices when shopping for metal buildings or steel buildings. |