Metal Building for Westmont, Illinois Build and Buy Online!
Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Steel Building PackagesSteel building kits are shipped with all the required hardware to construct a solid structure. Forget about running around town looking for bolts or brackets with steel building packages. When investigating steel building packages, request information about the different options that are available from each steel building manufacturer. Panel material or galvalume colors can complement any building and help to exceed your expectations. You can begin with more standard steel building packages and adjust them suit your specific needs. Working with veteran professionals is the best way to build your new steel building. Completing the steps that help you decide on different configurations for your pre-engineered building insures your ultimate satisfaction. Each part of the design process should be explained and offered for your approval. Steel building manufacturers should be acquainted with commonly asked questions and should be able to anticipate your concerns. Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. Steel Storage BuildingsSome people might not fully appreciate their need for a steel storage building. Think about all the prized possessions, and family heirlooms you are storing in the garage or attic - or even worse - paying high storage fees. There is a far more economical way to store all of your possessions. Whether you are looking to build a storage building for commercial or business use or a simple steel storage building for personal use - you cannot make a wiser choice than with a steel building system. The sturdy metal frame system makes steel storage buildings structurally superior. Pre-engineered steel buildings offer reliable protection to your investments. As with all products, not every manufacturer utilizes high quality materials. Look for a company that explains its materials and its use. Be sure to ask questions about steel storage buildings before you buy, any manufacturer will be happy to address any concerns. Thank you for visiting Metal Building for Westmont, Illinois. We provide the best service and prices when shopping for metal buildings or steel buildings. |