Metal Building for Cherry, Illinois Build and Buy Online!
Benifits of Steel BuildingsThere are many benefits to building with steel over conventional construction methods. A steel building is probably one of the most economical building choices you can make. Steel buildings have many features not available with many other forms of construction. Steel buildings are typically more economical than conventional methods and can be completed in approximately two-thirds the time required for conventional construction. The appearance of steel buildings can easily be enhanced with many forms of exterior finishes. A suitably insulated metal building can drastically decrease heating and cooling expenses. Insulated roof and wall systems preserve and reassure thermal efficiencies. Extended life materials reduce maintenance, and eliminate troubles such as structural deterioration, rotting and insect damage. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Steel Building ManufacturersFinding a bona fide steel building manufacturer is sometimes difficult. Everywhere you look there seems to be someone selling a "factory clearance" or "cancelled order" buildings. Well 99% of it is a farce. There are too many brokers and re-sellers out there to count. What they want is your deposit. You can fight with them about the actual details later. They just want the deposit. Take advantage of all the resources available to you. Try locating the manufacturer to match your expectations. This may be slightly more time consuming, but well worth it when your new steel building is delivered exactly to your specifications. Getting multiple bids for any kind of service is key. Ask several steel building manufacturers to quote your building and explain precisely by line item what your price includes. You can turn to the Internet to seek out steel building manufacturers, but be warned. You will encounter many wolves in sheep's clothing. Contact the Better Business Bureau, or other affiliations to ensure a company has a good track record. Form a list of qualified steel building manufacturers, do your research and you can gauge which manufacturers you prefer to deal with. Once your bids are returned to you, the selection process should be easy to complete. You can choose to follow up with the most qualified companies to purchase your metal building or to ask additional questions. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Thank you for visiting Metal Building for Cherry, Illinois. We provide the best service and prices when shopping for metal buildings or steel buildings. |