Metal Building for Buckingham, Illinois Build and Buy Online!
Metal Building Depot Sky LightThe Metal Building Depot sky light is an economical method of allowing natural lighting into your building. Sky Lights are commonly used for wall applications in lieu of roof. The sky lights are field installed with self-drilling screws and 3/8" grommet seal fasteners (field drilling required). The sky lights are available in 5'-0" and 10'-0" nominal lengths as a standard. The panel at the end of any wall with sky lights will be a full height metal panel for better corner trim attachment. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Pre Engineered Metal BuildingA pre engineered metal building is the obvious choice for a church or other type of meeting place. You may have noticed these structures since they are quickly becoming the "standard" in constructions methods. When you are looking for a cost effective way to meet your building needs, you should certainly think about a steel building. A pre-engineered metal building takes the risk out of putting yourself and your organization into debt. It is easy to identify the advantages in a pre-engineered metal building. You could delay development for years while you line up funding, but why? Some choose to rent space from other property owners in lieu of the responsibility of new construction. The problem with this situation is you only have access to your meeting place around someone else's schedule. After taking into account and dismissing these ideas, take some time to think about talking to a steel metal building manufacturer. As property and construction capital become harder to obtain, new solutions become ever more imperative. A pre-engineered metal building may perhaps not be part of the dream you have held for your club, association or church, however that shouldn't stop you. Some of the greatest things come in unlikely packages and we sometimes miss out when we disregard them too quickly. Thank you for visiting Metal Building for Buckingham, Illinois. We provide the best service and prices when shopping for metal buildings or steel buildings. |