Metal Building for Pine Mountain, Georgia Build and Buy Online!
Surface Air Film Coefficient (F) The amount of heat flow in BTU's per square foot per hour between an exposed surface of a material and the adjacent air. It is the measure of the conductance of heat through the air film that clings to all surfaces. Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. ABOUT USCOMMITMENT - Our Company's vision is "to maintain a leading-edge in the design, engineering, fabrication and delivery of the highest quality steel buildings in the industry." We are deeply committed to providing you with this service as a means of achieving our vision. VALUE - Low initial cost does not always provide the best value. It is just a small part of the picture. The values inherent in our designs assist in the ease of construction of the project but more importantly we provide a well-documented system that is easy to maintain. Much of the value we bring lies in the details. There is a true ART to engineering and design that provides added value to the Owner. EXPERIENCE - With over 8 years in the manufacturing business and key staff members with many more years in engineering, we have the requisite experience. Major hardware and accessory suppliers have reviewed our capabilities and recognize us as leaders in our field. Many of our projects involve very difficult project constraints. Dealing with these issues and tight project schedules is the trademark of our success. PROJECT METHODOLOGY - The success of a project lies in the talent of the design team and in the execution of the project. We first provide a strong project team, backed up with a well-defined and proven project execution methodology. Our project methodology has evolved over the years as we have executed numerous projects. It begins with our proposal document and extends through project documents, design sequence, system testing, acceptance documents and to the final delivery of our building system. The key to our methodology is communication. We strongly believe in defining what we are providing and expanding this initial definition as the project continues. QUALITY - In engineering, quality relates to the designs we produce and the timing in project execution. Our goal for design is to provide a superior level of detail in documentation. We strive for uniformity of design, providing details often left out by others and keeping systems simple. The key to being on time is project execution. First, a well-defined project methodology is needed to set the planning framework. Second, understanding of the Owner's needs is paramount. Finally, our years of experience in the execution of critical projects have given us an essential edge over our competitors. Key members of our staff have up to thirty-five years of experience in project engineering and execution. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. Thank you for visiting Metal Building for Pine Mountain, Georgia. We provide the best service and prices when shopping for metal buildings or steel buildings. |