Metal Building for Newington, Georgia Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thermal Conductivity (K-Value)A unit used to express the amount of heat, in BTU's per hour, that passes through one square foot of homogeneous material that is exactly one inch thick and has a temperature difference of one degree Fahrenheit between its surfaces. As the K-Value decreases, so does the amount of heat permitted to pass through the material. Perm RatingThe perm rating, or permeance, is a measure of the amount of water that passes through one square foot of material per hour. The lower the perm rating, the more effective the barrier. A facing material with a perm rating of 0.1 or less is considered excellent. Anything with a rating above 1.0 is not considered a vapor barrier. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Metal Building KitPurchasing your new metal building kit. You should be cautious when buying a metal building kit. Not every manufacturer uses high quality materials or fabricates to the latest industry standards. You don't want to purchase a building from a manufacturer (or broker) whose building parts were produced in a factory without the benefit of a skilled eye to oversee the process. A pre-engineered metal building should come with a complete and comprehensive set of blueprints. When a qualified steel building manufacturer puts its seal of approval on your building design you can rest assured of its structural integrity. You can expect detailed documentation about the building's fabrication and its specific code requirements as well. Before you purchase a metal building kit you should attempt to create a basic plan for its end use and design. Working with a professional steel building company should ensure that all facets of your building are taken into consideration. They can explain the building options and codes in detail so you have the accurate building specifications. Thank you for visiting Metal Building for Newington, Georgia. We provide the best service and prices when shopping for metal buildings or steel buildings. |