Metal Building for Keysville, Georgia Build and Buy Online!
Controlling CondensationTwo things must be present for condensation to occur: warm moist air and cool surface temperatures below the dew point. The proper control of these two factors can minimize condensation. In metal buildings, we are concerned with two different areas or locations: visible condensation which occurs on exposed surfaces below dew point temperatures, and concealed condensation which occurs when moisture has passed through the vapor retarder and into interior roof and/or wall cavities and then condenses on a surface below dew point temperature. Gutters & DownspoutsThese are generally not required on steel buildings. However, use of these components often enhances the appearance of a building, control drip, splash and drainage. Gutters and downspouts are an optional accessory that serves as trim. Gutters dramatically improve the appearance of buildings, and we recommend them for most building applications. Downspouts control the water falling from the roof, preventing the water from splashing up on the sides of the building. On every Metal Building Depot building, die-formed ridge caps are used to cover the peak opening in the center ridge of the building. Some sellers provide a ridge roll cover that must be sealed with closures. Installing ridge roll trim is not an easy task. Over time the exposed foam closures deteriorate and there can be potential leak problems. Our die-formed ridge caps match the panel profile perfectly and are formed to fit the pitch of the roof. Die-formed ridge caps create an almost seamless transition across the roof. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Frame FeaturesConnection Clips - Specially fabricated clips are designed to securely connect structural components. Many companies supply only blank plates that must be cut, drilled and/or welded to components before assembly can begin. In some cases it may require many hours of work to connect required clips. Metal Building Depot details and supplies each clip and placement to every building manufactured. We factory weld all clips onto rigid frames and guarantee the correct placement of all component connections. Don't waste your time and money attaching clips that should have been factory located. Structural Bracing - Most buildings under 60' have sufficient diaphragm action or "panel shear" that provides all the bracing needed to stabilize the building. In some cases of high winds, seismic or snow loads may cause more stress than panel shear can handle, so additional reinforcement may be required. In these extreme cases we will employ the use of X bracing to reinforce the frame. In situations where X bracing cannot be used a wind column is an excellent addition to strengthen a vertical rigid frame column. A portal frame is sometimes used in extreme load circumstances. Portal frames are fairly expensive and only necessary in rare circumstances. Misleading Information - Deceptive PracticesThe standards and values of our industry are regularly masked by the deceptive practices of the unprincipled few. These companies deliberately mislead people hoping to increase their chances of a sale. At Metal Building Depot we know that the more you understand about the product you are buying, the more confidant you will be at purchase time. Arm yourself with information - No manufacturer keeps an inventory of buildings "ready to ship." Without exception, steel buildings are made specifically to order. A building should be designed to meet your needs and more importantly - your building code. Some companies create "general" price lists for common sizes, but the selection is very limited to a geographic area with limited variance in design. Beware of companies implying they keep an existing inventory of buildings. To find out whether a "clearance" or "cancelled order" really exists inquire on the earliest ship date. You should be able to take immediate delivery on a building "ready to ship." There is no such thing as making simple structural changes on a pre-designed building. Moving or adding a door opening on an existing or "ready to ship" building - could require the use of a wind column or portal frame. This could change the rigid frame design and render the existing design useless. Additionally, changing the wind or snow load could require the girt and purlin spacing to change and the location of connection plates along columns and rafters may not be located properly. The bottom line is that a structural change most likely requires a new building design. The moral of this story is: If a seller claims to have a building "ready to ship" make sure it will meet or exceed you local building codes and loads and more importantly - your needs. Proposal or Propose "ALL" - We want to help you eliminate the "gray areas" in a typical building quote. The items listed on your contract should be made clear as to exactly what is being promised. Our itemized contracts are detailed and specific and you'll never see "included" in one price (without a description). All your accessories and options are listed as separate line items. With our online quote you will always know exactly what you're paying for. Thank you for visiting Metal Building for Keysville, Georgia. We provide the best service and prices when shopping for metal buildings or steel buildings. |