Metal Building for Clarkesville, Georgia Build and Buy Online!
Controlling CondensationTwo things must be present for condensation to occur: warm moist air and cool surface temperatures below the dew point. The proper control of these two factors can minimize condensation. In metal buildings, we are concerned with two different areas or locations: visible condensation which occurs on exposed surfaces below dew point temperatures, and concealed condensation which occurs when moisture has passed through the vapor retarder and into interior roof and/or wall cavities and then condenses on a surface below dew point temperature. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: COMMERCIAL OFFICESYour place of business should and can be more than just a place to work. It should reflect your company's image and be no less comfortable, functional or attractive than your living environment. Entry-ways and lighting, interior wall placement, and location of restrooms are as important in your office building as they are in your own home. Properly planned, your facility will serve your needs for many years to come, and you will avoid future changes or costly remodeling. Modern ceiling and interior wall systems are very easily adapted to our manufactured building components using standard methods. For instance, perimeter sheet rock walls may be installed by simply attaching metal furring strips (hat channel) to the secondary wall framing members (girts). Similarly, acoustic panel or dry-wall ceilings may be installed by simply wrapping the ceiling suspension wires around the secondary roof framing members (purlins). Additionally, port-a-wall systems may be installed as needed throughout the structure. Additional loads from heating and air conditioning systems, dropped ceilings, electrical conduit and lighting fixtures, or large mechanical sprinkler systems can be accommodated easily at your request with minimal cost, assuring a full roof-load certification. The building components may represent a small percentage of the total cost of your office budget. Therefore, we are careful to ensure that the main structural components we provide will be reliable, helping to protect your investment against any water seepage, leaks or storm damage that can deteriorate your office complex. When selecting the manufacturer of your building components, careful consideration must be given to both function and price. Your dealer will encourage you to have an architect review all aspects of your building plan, including lighting requirements, window heights, storage space, carpet wear ability, entrances, landscaping, parking and signage, to ensure you of a facility that will maintain its value and be a source of pride for years to come. Metal FrameWhat is a stronger material than metal? Metal frame buildings are nearly indestructible. You can certainly feel safe in even the worst weather in a metal frame structure. Erecting a metal frame pre engineered building might sound like a difficult project, but despite this perception, it is really not the case. Metal frame structures are cut to precise measurements and a complete set of building plans will aid in the assembly process. If you need help constructing your metal building, you will incur additional expenses, so be sure to factor construction cost into your budget when purchasing a steel building. Why are steel buildings so popular?That's easy. Price. All around price. They are less per square foot than any other known form of construction, and can be erected quickly, offering its owners faster access to their new building. We are seeing more buildings sold for residential use. People are putting up shops and garages faster than you can count. As rural America gets divided into smaller ranches, we see the increase for barns, arenas, horse stalls... etc. Thank you for visiting Metal Building for Clarkesville, Georgia. We provide the best service and prices when shopping for metal buildings or steel buildings. |