Metal Building for Jupiter, Florida Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. Overall Heat Transmission Coefficient (U-Value) A unit used to express heat passage through a complete building section, including air films. U-Values serve as a basis for determining transmitted heat loss. The lower the U-Value, the higher the insulation value. Thank you for visiting Metal Building for Jupiter, Florida. We provide the best service and prices when shopping for metal buildings or steel buildings. |