Metal Building for Belleview, Florida Build and Buy Online!
FacingsIn addition to acting as a decorative protection barrier, facings serve an integral part of the overall insulation system. Facings provide vapor barriers, light reflectivity and structural strength. In some cases, a reinforcement of fiberglass scrim is used for extra rigidity and greater impact resistance. The effectiveness of a vapor barrier depends on three primary factors: 1) Location within the insulated section 2) Permeance 3) Proper installation Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Panel OptionsColor or Galvalume - Our online system includes both Galvalume Plus® and SMP Colors. For a small price increase you can add a colored roof. Our standard colored panels consist of a Galvalume® sheet that has been primed and coated with Silicon Modified Polyester (SMP) paint. Both panel types of panel are very tough, and both our Galvalume Plus® warranty and our paint warranty run for 25 and 30 years respectively. The Galvalume Plus® panels cost less, but the painted panels give your steel building a more refined look. Color and Roof Pitch - When considering color over Galvalume, be sure to take the roof pitch into account. Higher-pitched roofs are more noticeable, but with a low-pitched roof very little of the roof can be seen. General GuidelinesWhen you decide to buy a Building - Confirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Thank you for visiting Metal Building for Belleview, Florida. We provide the best service and prices when shopping for metal buildings or steel buildings. |