Metal Building for Durham, Connecticut Build and Buy Online!
General GuidelinesWhen you decide to buy a Building - Confirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Facings as Vapor BarriersThe main function of facings is to act as a vapor barrier. While a vapor barrier may not necessarily be able to stop the flow of water vapor, it does an excellent job of minimizing the rate and volume of the flow. This prevents moisture from accumulating within the insulation blanket and the structure, which translates into consistent thermal values and lower heating and cooling costs. Facings intended to serve as vapor barriers should be installed on the inner, heated surface of the insulation, where vapor pressure is the highest. This helps in preventing vapor from reaching the cooler air and condensing. VAPOR BARRIERS PREVENT VAPOR FROM REACHING COOLER AIR AND CONDENSING. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Steel Buildings vs. Conventional ConstructionA great advantage of pre-engineered buildings is that they can be relocated if required. Since your building is shipped to you with a complete set of instructions, detailed engineering drawings and a shipping list, you can erect you steel building without consulting a construction company. This also means that should you someday decide to relocate, you can take down your building and erect it elsewhere. Adding partition walls in a steel building allows one building to be a meeting room, or office and storage facility and another to be a restaurant. Building with steel gives you the ultimate in design flexibility. You can either own one outright or purchase a steel building to rent to others. Your one time cost is regained sooner rather than later when you rent it as mini storage or public meeting space. Steel buildings can be designed with a almost unlimited amount of options. If you have a need for a new building, don't make a decision until you have explored your options with a qualified steel building manufacturer. The Steel Building Network has reviewed a wide range of manufacturers, suppliers and building industry professionals, and we know that no matter what your intended use, there is steel building system to suit your needs. Getting I contact with the right company to get your questions answered is the first step in having your building needs met. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Thank you for visiting Metal Building for Durham, Connecticut. We provide the best service and prices when shopping for metal buildings or steel buildings. |