Metal Building for Strawberry Valley, California Build and Buy Online!
Facing TypesPopular Facings include: WMP-VR-R,WMP-VR,WMP-VR-BLACK,WMP-10,WMP-10-BLACK,WMP-50 Specialty Facings include: WCF-50,WCF-30,WMP-30,Arenasheild,Gymguard,R-3035-HD,WMP-F,VRP-HD,VSF-HD Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Steel Storage BuildingsSome people might not fully appreciate their need for a steel storage building. Think about all the prized possessions, and family heirlooms you are storing in the garage or attic - or even worse - paying high storage fees. There is a far more economical way to store all of your possessions. Whether you are looking to build a storage building for commercial or business use or a simple steel storage building for personal use - you cannot make a wiser choice than with a steel building system. The sturdy metal frame system makes steel storage buildings structurally superior. Pre-engineered steel buildings offer reliable protection to your investments. As with all products, not every manufacturer utilizes high quality materials. Look for a company that explains its materials and its use. Be sure to ask questions about steel storage buildings before you buy, any manufacturer will be happy to address any concerns. Metal FrameWhat is a stronger material than metal? Metal frame buildings are nearly indestructible. You can certainly feel safe in even the worst weather in a metal frame structure. Erecting a metal frame pre engineered building might sound like a difficult project, but despite this perception, it is really not the case. Metal frame structures are cut to precise measurements and a complete set of building plans will aid in the assembly process. If you need help constructing your metal building, you will incur additional expenses, so be sure to factor construction cost into your budget when purchasing a steel building. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Thank you for visiting Metal Building for Strawberry Valley, California. We provide the best service and prices when shopping for metal buildings or steel buildings. |