Metal Building for Phelan, California Build and Buy Online!
ABOUT USCOMMITMENT - Our Company's vision is "to maintain a leading-edge in the design, engineering, fabrication and delivery of the highest quality steel buildings in the industry." We are deeply committed to providing you with this service as a means of achieving our vision. VALUE - Low initial cost does not always provide the best value. It is just a small part of the picture. The values inherent in our designs assist in the ease of construction of the project but more importantly we provide a well-documented system that is easy to maintain. Much of the value we bring lies in the details. There is a true ART to engineering and design that provides added value to the Owner. EXPERIENCE - With over 8 years in the manufacturing business and key staff members with many more years in engineering, we have the requisite experience. Major hardware and accessory suppliers have reviewed our capabilities and recognize us as leaders in our field. Many of our projects involve very difficult project constraints. Dealing with these issues and tight project schedules is the trademark of our success. PROJECT METHODOLOGY - The success of a project lies in the talent of the design team and in the execution of the project. We first provide a strong project team, backed up with a well-defined and proven project execution methodology. Our project methodology has evolved over the years as we have executed numerous projects. It begins with our proposal document and extends through project documents, design sequence, system testing, acceptance documents and to the final delivery of our building system. The key to our methodology is communication. We strongly believe in defining what we are providing and expanding this initial definition as the project continues. QUALITY - In engineering, quality relates to the designs we produce and the timing in project execution. Our goal for design is to provide a superior level of detail in documentation. We strive for uniformity of design, providing details often left out by others and keeping systems simple. The key to being on time is project execution. First, a well-defined project methodology is needed to set the planning framework. Second, understanding of the Owner's needs is paramount. Finally, our years of experience in the execution of critical projects have given us an essential edge over our competitors. Key members of our staff have up to thirty-five years of experience in project engineering and execution. Base ConditionEvery metal building has some type of base connection along the building perimeter, allowing the connection of sheeting. This "base condition" determines exactly how the panels connect to the foundation. To prevent water and pests from entering the building at the base, panels extend below the finished floor of the building. Online design and pricing systems allows users to choose from a number of different base options. Standard Base Angle - Our system defaults to a standard base angle condition. This condition consists of a single angle member, attached to both the wall sheets and the slab. Please note that the standard base condition requires that the slab be formed with a 1˝" sheet notch to allow the sheets to extend below the top of the slab. Deluxe Trim - Deluxe base trim is another option for buildings with concrete slab foundations. Deluxe base trim combines base angle and trim into one piece, providing all the benefits of base trim and base angle. Deluxe base trim is only available in burnished slate color. Base Girt - The base girt option is designed for buildings that sit on piers rather than a full slab. A base girt system does not rest on or attach to the foundation. The base girt attaches to clips on the columns about 6" above the foundation. The base girt provides a great connection for liner panel. Base Channel - The Base channel is a "cee" shaped section that runs the perimeter of the building connected to the floor. It is most commonly used when a liner panel, or interior wall, is going to be installed. The "cee" section provides a pre-positioned connection point for inside panels. This approach requires a sheet notch in the slab (for an alternative, see the combination of base channel and base trim below). Installation and Selection of InsulationWe provide the highest quality products available. However, proper installation and selection is imperative for maximum effectiveness. Please refer to installation instructions to ensure correct procedures are used. Facings that have been torn or punctured are no longer capable of blocking water vapor and may eventually do more harm than good. Be sure to quickly patch any holes in the vapor barrier. When selecting a facing, special consideration should be given to its reflective quality. A facing with high reflectivity reduces the need for high light levels in work areas. This results in reduced energy costs and increased productivity. Although the fiberglass insulation itself is not affected by cold weather, the facing is. Colder temperatures can cause cold crack, a situation where the facing becomes brittle and if handled can crack. Bay Insulation recommends that vinyl faced fiberglass products never be installed in temperatures below 40 degrees. FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Heat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. Thank you for visiting Metal Building for Phelan, California. We provide the best service and prices when shopping for metal buildings or steel buildings. |