Metal Building for Mount Shasta, California Build and Buy Online!
Storage Building PlansNo architect or engineer is required to read steel building plans. Although they are technical, they are created so anyone can easily comprehend them. When your steel building package arrives, you will find a wealth of useful information and instructions on building installation. Storage building plans for steel storage buildings show common construction details. The floor plan is displayed so you know what, and in which order to do each task. If you have any difficulties, your steel building manufacturer can easily explain the process. Another important thing you should remember is, since you are an integral part of the building design phase, you should be very familiar with the basic floor plan. But, if you need assistance with building plans, your supplier should explain the layout in a manner more complimentary to your way of thinking. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Panel ProfilesRoof Panel Profiles - Our standard roof sheeting is the "PBR" panel, which is available in bare Galvalume Plus® as well as a variety of colors. Wall sheeting is available in "R" and "PBR" panel. Depending on the color and your geographic location - PBR panels may not be available for certain colors. Liner Panels - For liner panels we offer a low-rib 29-gauge panel. Liner panels are an interior covering for the walls of a steel building. Like exterior walls, liner panel consists of 3-foot wide panels that are attached to the framing in the same manner as exterior sheeting. Full-height liners run from floor to roof. Partial-height liners typically attach to the girt at 7'4" and extend a few inches above it. Buildings with liner panels must have a base connection for the bottom of the panel (see base conditions). Advantages - Liner Panels enhance appearance, providing a finished look for the interior. The biggest advantage is that liners protect the insulation and the outside walls. Because un-reinforced insulation facings tear easily, and even the best-reinforced materials can be damaged, liner panels are the intelligent solution to protect your investment. Although 26-gauge exterior walls can withstand a lot of punishment, a steel liner will protect your building's interior and performs at a lower cost than other wall coverings, which will require their own framing. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. When you decide to buy a BuildingConfirm the accuracy of your building codes. It is imperative that your building conforms to the state, local and federal design requirements. The items described on your contract are what you are buying. Please be sure to carefully review all contract documents before you sign off. If a contract does not describe an item in specific terms, you should not expect the item to be the best product available. And just as important - is what a contract does not say. Specifically if your contract does not indicate that you are getting framed openings and garage doors - then you are NOT going to get framed openings and garage doors. Do not sign a contract or agree to purchase a building before you have confirmed that your building will satisfy the requirements of your local building official and YOURSELF. Do not allow a salesman to pressure you into a "panic buy." A "panic buy" is when a customer is pressured into making a purchase to "lock-in" a "so-called" special price. Brokers are notorious for telling customers they could lose an opportunity to get the "deal of a lifetime" if they don't commit to the order right away. Beware of people who urge you to sign a contract before you have made your mind up on exactly what you want. Understand that making changes after the sale will cost you money. Once the design is completed it will cost money to make changes. If an order is in fabrication - and requires modifications due to customer demands - the entire process has to be stopped, pulled off-line and inventoried. Once the inventory of completed items is confirmed, it's back to the drawing board. You will be responsible for extra time required to re-design the project and all other associated expenses. Install your building components as specified by the drawings. Seldom do manufacturers use the same design practices and therefore your erection drawings and installation documents are the correct description of the building. Please read and follow the drawing descriptions carefully. An erection manual offers important general guidelines and the proper procedures for erecting a steel building safely. You, your erector and all jobsite crew need to understand and utilize OSHA and all other safety guidelines. Thank you for visiting Metal Building for Mount Shasta, California. We provide the best service and prices when shopping for metal buildings or steel buildings. |