Metal Building for Lockwood, California Build and Buy Online!
Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. Surface Air Film Coefficient (F) The amount of heat flow in BTU's per square foot per hour between an exposed surface of a material and the adjacent air. It is the measure of the conductance of heat through the air film that clings to all surfaces. Calculated Thermal ValuesBasically it is the reciprocal of the calculated U-Value. By definition it is the summation of all the R-Values for each of the building's components. This method of calculation does not consider the thermal short circuit effect of structural members, fastener population or the compression of the insulation at its structural members. It should also be noted that this type of calculation often indicates heat loss values for building envelopes that are lower than those actually found in the finished structure. Facings as Vapor BarriersThe main function of facings is to act as a vapor barrier. While a vapor barrier may not necessarily be able to stop the flow of water vapor, it does an excellent job of minimizing the rate and volume of the flow. This prevents moisture from accumulating within the insulation blanket and the structure, which translates into consistent thermal values and lower heating and cooling costs. Facings intended to serve as vapor barriers should be installed on the inner, heated surface of the insulation, where vapor pressure is the highest. This helps in preventing vapor from reaching the cooler air and condensing. VAPOR BARRIERS PREVENT VAPOR FROM REACHING COOLER AIR AND CONDENSING. Thank you for visiting Metal Building for Lockwood, California. We provide the best service and prices when shopping for metal buildings or steel buildings. |