Metal Building for Pettigrew, Arkansas Build and Buy Online!
Facing TypesPopular Facings include: WMP-VR-R,WMP-VR,WMP-VR-BLACK,WMP-10,WMP-10-BLACK,WMP-50 Specialty Facings include: WCF-50,WCF-30,WMP-30,Arenasheild,Gymguard,R-3035-HD,WMP-F,VRP-HD,VSF-HD Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. INDUSTRIALAs a company rooted in American heavy industry, We understand and appreciate the importance of strength, dependability and economy in industrial structures. Our Dealers work closely with industrial building users to meet stringent construction schedules, assist with designs for machinery and inventory layouts, and assure the design and the manufacture of strong, stable, low-maintenance structures which enhance the image of their users. Our own in-house team of experienced engineers can also help design crane buildings with a unique combination of strengths and hook clearances to fit individual, industrial requirements and criteria. Clear spans of up to 150 feet wide and heights of up to 60 feet are available, while multi-span systems allow for unlimited widths. Our experienced engineers can provide flexibility in solving industrial needs through design and use of mezzanines, customized loading docks, and a variety of door systems. Whatever your company's requirements are for space, height, width, length or load capacity, a Metal Building system can be designed and manufactured to match them closely and economically. We are proud to serve you and to be an integral part of the American industrial machine. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Thank you for visiting Metal Building for Pettigrew, Arkansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |