Metal Building for Magazine, Arkansas Build and Buy Online!
Frame TypesUnlike any of our competitors, we allow you to price all building frame types. Select from Clear-span or Modular rigid-frame buildings. We allow you the full flexibility to choose Gable, Single Sloped or Offset Peak building shape. By far, we offer the widest selection of building and frame types. For options not available through the online system, you will need to request a special quote. Clear-span Frames - A clear-span rigid frame offers strength and economy. Since no interior supports are necessary, this design is best when you require large areas of clear and uninterrupted space. Factories, warehouses and agricultural buildings are just a few building types that may utilize a clear-span frame building. A clear-span design does have size limitations. As the desired width increases, the frames will become larger and heavier to carry greater loads across the length of the frame. At some point the cost will outweigh the benefit. Even so, clear-span buildings are still effective for buildings as wide as 150' feet and wider in some cases. Modular Frames - Modular frames use interior columns to evenly distribute the load; reducing the cost of both the frame and foundation of extra wide buildings. The economical advantages become obvious when a building width is about 100' wide or wider. As a result, almost all buildings 100' wide or wider have interior support columns. Modular designs are often used for large factories and warehouses. Single Slope Frames - Single slope frames have high and low eave heights creating a roof that "slopes" from side to side. To select a single slope design, you specify one eave height and define the roof pitch. Single slope designs are frequently used for strip shopping centers, offices, and RV/Boat storage facilities. Just about every steel building has at least one framed opening. It is not unusual for buildings to have several openings. Most openings are created for an overhead door, but can be used for the installation of glass fronts or other entries. Most other online sellers offer "field located" framed openings, which require cutting and fabricating on the job site. Metal Building Depot always provides factory-located openings unless your project requires something otherwise. PUBLIC and CHURCHServing the building needs of America's churches, schools and local, state or federal government is a challenge. A church in Tennessee (above) employs a 60-foot clearspan structure with a specially designed hip-roof to accommodate a spacious open sanctuary. Wood and drywall were used to cover the massive steel beams that meet in the center and support the heavy, built-up roof system. Outside, the application of brick gives the feeling of strength and permanence. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Thank you for visiting Metal Building for Magazine, Arkansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |