Metal Building for Casscoe, Arkansas Build and Buy Online!
Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Pre Engineered Metal BuildingsDeciding to use a pre-engineered metal building is a wise choice. But, there is important information you will need to provide to the manufacturer in order to have your new steel building to be designed to precise specifications. Understanding your building needs and restrictions can help when you consult with a steel building manufacturer. A few questions you need to ask yourself once you decide to buy a metal building system. What are my size limitations? What will the building be used for? What special building requirements are needed? Why the answers to these questions are so critical is that they expose precisely what kind of pre-engineered building system will satisfy your needs. Metal church buildings have very different structural demands than those of mini storage buildings. If investing money into a pre engineered metal building system it only makes sense to research all options. Perplexed about where to start? Contact a manufacturer; they will ask you the right questions to get what information they need to suitably determine your building needs. They can also help you review your requirements to equip your structure with the appropriate interior and exterior features. Ridge VentRidge vents come completely assembled for ease of installation. Ridge vents supplied by Metal Building Depot are of a low profile design to provide gravity type ventilation. Because gravity ridge vents are designed to allow free airflow, some penetration of water during blowing rains is to be expected. Standard available finishes for the ridge vents are polar white and galvalume. Other colors may be available at an additional cost. Nominal ridge vent length is 10'-0". Ridge vents are available with 9" and 12" throats. Bird screens are provided as a standard. The ridge vents can be ordered as continuous or single units. Exterior parts are 26 gage painted or galvalume. Interior parts are all made of G90 galvanized steel. The substructure consists of 10 gage saddle straps with interior baffles of 24 gage steel. Lifter arms and damper slides are made of 18 gage steel. Manual operation is through activation of a pull bar which is attached internally to bell cranked type lifter arms connected to the damper with Teflon coated pins through the damper slides. Dampers are spring loaded to remain in the open position until the pull bar is operated and locked in the closed position. Dampers operate in a vertical manner. Each vent is opened by a pull chain that extends approximately 12" below the roof unless noted otherwise on the order documents. Other opening mechanisms are available at an additional cost upon special request. Ridge vents should not be placed closer than 5’-0" to the endwall steel line to allow room to properly flash the building. For example, a 90’-0" long building with ridge vents required the entire length should have no more than (8) units. The ridge vents are available with the following accessories: Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. Thank you for visiting Metal Building for Casscoe, Arkansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |