Metal Building for Caraway, Arkansas Build and Buy Online!
FoundationsDo I need a foundation for my metal building? - Some people choose to pour a full slab foundation, however if you're planning on leaving the floor in a dirt or gravel condition, concrete piers will do the job just fine. Please contact a customer service representative if you don't plan to pour a full slab foundation. Can you provide an engineer stamped foundation layout? - Yes, but in some cases your soil conditions play a major role in the type of foundation you can use. Contact our special sales department for more information. If using a local engineer, we will provide anchor bolt plans to aid your engineer in designing the foundation. Do you supply the hardware to attach the frame to foundation? - No, the anchor bolts are usually supplied by a concrete contractor and placed when the foundation is poured. Steel Building PackagesSteel building kits are shipped with all the required hardware to construct a solid structure. Forget about running around town looking for bolts or brackets with steel building packages. When investigating steel building packages, request information about the different options that are available from each steel building manufacturer. Panel material or galvalume colors can complement any building and help to exceed your expectations. You can begin with more standard steel building packages and adjust them suit your specific needs. Working with veteran professionals is the best way to build your new steel building. Completing the steps that help you decide on different configurations for your pre-engineered building insures your ultimate satisfaction. Each part of the design process should be explained and offered for your approval. Steel building manufacturers should be acquainted with commonly asked questions and should be able to anticipate your concerns. Building Delivery/ShipmentHow long does it take to get my metal building? - It usually takes between 4-8 weeks for your metal building to arrive after the order has been placed. MBD.com will supply you with a estimated delivery date upon order and a guaranteed date after fabrication. How do I unload my metal building? - In most cases you'll need some heavy equipment (forklift) and a few helpers to get the job done. Everything will arrive at once so be sure to have your location prepped for material. After unloading your metal building be sure to do an inventory of ALL of your items, and let us know immediately if anything is missing. The amount of time to report missing items is limited to 5 days due to job site theft. What if I’m not ready to put the metal building up when it gets there? - Your materials can be stored. Be sure to look over the information included to properly care for your wall and roof sheets. Please see UNLOADING AND STORING your building for more details. What will freight cost? - We keep costs as low as possible. Your costs will vary depending on the mileage and the weight of your metal building. Visible CondensationTo effectively control visible condensation, it is necessary to reduce the cold surface areas where condensation may occur. It is also important to minimize the air moisture content within a building through the use of properly designed ventilating systems. Condensation ControlThe condensation process occurs when warmer moist air comes in contact with cold surfaces such as framing members, windows and other thermally conductive accessories, or the colder region within the insulation itself (if moisture has penetrated the vapor retarder). Warm air, having the ability to contain more moisture than cold air, loses that ability when it comes in contact with cooler surfaces or regions. When this happens, excessive moisture in the air is released in the form of condensation. If this moisture collects in the insulation, the insulating value is decreased. In dealing with condensation, air may be considered to be a mixture of two gases-dry air and water vapor. One thousand cubic feet of air at 75°F can hold up to 1.4 pints of water. At 45°F, it can hold only 0.5 pints. Relative Humidity is a percentage measurement of the amount of water vapor present in the air in relation to the amount it is capable of holding at that temperature. Therefore, 50% Relative Humidity would mean that the air is carrying only one-half of the total amount of moisture that it could be holding at that particular temperature. Cold outside air is usually much drier than warm inside air. Therefore, you can lower the Relative Humidity by bringing in outside air to mix with and dilute the moist inside air. At 100% Relative Humidity, the air is "saturated." The temperature at which the air is saturated and can no longer hold additional moisture is called the dew point temperature. Whenever air temperature drops below its dew point, excess moisture will be released in the form of condensation. Condensation problems are most likely to occur in climates where temperatures frequently dip to 35°F or colder over an extended period of time. Thank you for visiting Metal Building for Caraway, Arkansas. We provide the best service and prices when shopping for metal buildings or steel buildings. |