Metal Building for Kodiak, Alaska Build and Buy Online!
Facings as Vapor BarriersThe main function of facings is to act as a vapor barrier. While a vapor barrier may not necessarily be able to stop the flow of water vapor, it does an excellent job of minimizing the rate and volume of the flow. This prevents moisture from accumulating within the insulation blanket and the structure, which translates into consistent thermal values and lower heating and cooling costs. Facings intended to serve as vapor barriers should be installed on the inner, heated surface of the insulation, where vapor pressure is the highest. This helps in preventing vapor from reaching the cooler air and condensing. VAPOR BARRIERS PREVENT VAPOR FROM REACHING COOLER AIR AND CONDENSING. Frame TypesUnlike any of our competitors, we allow you to price all building frame types. Select from Clear-span or Modular rigid-frame buildings. We allow you the full flexibility to choose Gable, Single Sloped or Offset Peak building shape. By far, we offer the widest selection of building and frame types. For options not available through the online system, you will need to request a special quote. Clear-span Frames - A clear-span rigid frame offers strength and economy. Since no interior supports are necessary, this design is best when you require large areas of clear and uninterrupted space. Factories, warehouses and agricultural buildings are just a few building types that may utilize a clear-span frame building. A clear-span design does have size limitations. As the desired width increases, the frames will become larger and heavier to carry greater loads across the length of the frame. At some point the cost will outweigh the benefit. Even so, clear-span buildings are still effective for buildings as wide as 150' feet and wider in some cases. Modular Frames - Modular frames use interior columns to evenly distribute the load; reducing the cost of both the frame and foundation of extra wide buildings. The economical advantages become obvious when a building width is about 100' wide or wider. As a result, almost all buildings 100' wide or wider have interior support columns. Modular designs are often used for large factories and warehouses. Single Slope Frames - Single slope frames have high and low eave heights creating a roof that "slopes" from side to side. To select a single slope design, you specify one eave height and define the roof pitch. Single slope designs are frequently used for strip shopping centers, offices, and RV/Boat storage facilities. Just about every steel building has at least one framed opening. It is not unusual for buildings to have several openings. Most openings are created for an overhead door, but can be used for the installation of glass fronts or other entries. Most other online sellers offer "field located" framed openings, which require cutting and fabricating on the job site. Metal Building Depot always provides factory-located openings unless your project requires something otherwise. ABOUT USCOMMITMENT - Our Company's vision is "to maintain a leading-edge in the design, engineering, fabrication and delivery of the highest quality steel buildings in the industry." We are deeply committed to providing you with this service as a means of achieving our vision. VALUE - Low initial cost does not always provide the best value. It is just a small part of the picture. The values inherent in our designs assist in the ease of construction of the project but more importantly we provide a well-documented system that is easy to maintain. Much of the value we bring lies in the details. There is a true ART to engineering and design that provides added value to the Owner. EXPERIENCE - With over 8 years in the manufacturing business and key staff members with many more years in engineering, we have the requisite experience. Major hardware and accessory suppliers have reviewed our capabilities and recognize us as leaders in our field. Many of our projects involve very difficult project constraints. Dealing with these issues and tight project schedules is the trademark of our success. PROJECT METHODOLOGY - The success of a project lies in the talent of the design team and in the execution of the project. We first provide a strong project team, backed up with a well-defined and proven project execution methodology. Our project methodology has evolved over the years as we have executed numerous projects. It begins with our proposal document and extends through project documents, design sequence, system testing, acceptance documents and to the final delivery of our building system. The key to our methodology is communication. We strongly believe in defining what we are providing and expanding this initial definition as the project continues. QUALITY - In engineering, quality relates to the designs we produce and the timing in project execution. Our goal for design is to provide a superior level of detail in documentation. We strive for uniformity of design, providing details often left out by others and keeping systems simple. The key to being on time is project execution. First, a well-defined project methodology is needed to set the planning framework. Second, understanding of the Owner's needs is paramount. Finally, our years of experience in the execution of critical projects have given us an essential edge over our competitors. Key members of our staff have up to thirty-five years of experience in project engineering and execution. Pre Engineered Metal BuildingA pre engineered metal building is the obvious choice for a church or other type of meeting place. You may have noticed these structures since they are quickly becoming the "standard" in constructions methods. When you are looking for a cost effective way to meet your building needs, you should certainly think about a steel building. A pre-engineered metal building takes the risk out of putting yourself and your organization into debt. It is easy to identify the advantages in a pre-engineered metal building. You could delay development for years while you line up funding, but why? Some choose to rent space from other property owners in lieu of the responsibility of new construction. The problem with this situation is you only have access to your meeting place around someone else's schedule. After taking into account and dismissing these ideas, take some time to think about talking to a steel metal building manufacturer. As property and construction capital become harder to obtain, new solutions become ever more imperative. A pre-engineered metal building may perhaps not be part of the dream you have held for your club, association or church, however that shouldn't stop you. Some of the greatest things come in unlikely packages and we sometimes miss out when we disregard them too quickly. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Thank you for visiting Metal Building for Kodiak, Alaska. We provide the best service and prices when shopping for metal buildings or steel buildings. |