Metal Building for Wedowee, Alabama Build and Buy Online!
Structural DesignWe design and manufacture pre-engineered steel buildings, and offer you a number of advantages over conventional construction techniques. Steel buildings are inexpensive and incredibly tough. Our bolt-together design is assembled quickly without any specialized skills. Each rigid frame is comprised of two or more columns supporting a rafter across the width of the building. In most steel buildings, endwall bearing frames support one-half the load of a rigid "main" frame. In most situations, we utilize the more economical "bearing" end frames. Adding an expandable endwall or rigid frame is only a click away. Unlike any of our competitors, we allow you to choose the endwall condition of your building. Depending on design considerations, our endwall rafters and columns may be either hot rolled or cold-formed. The space between the rigid frames of a steel building is referred to as a "bay."- an 80' long building has been divided into four 20' bays by spacing the frames 20' apart (4 x 20' = 80'). This configuration is described as "four bays at 20." A 100' building could be configured with four bays at 25 (4x 25' = 100') Endwall bay spacing is usually determined by the building width. You can add one or more framed openings to most buildings. Endwall bay spacing can usually changed to accommodate your needs without changing the price. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. FacingsIn addition to acting as a decorative protection barrier, facings serve an integral part of the overall insulation system. Facings provide vapor barriers, light reflectivity and structural strength. In some cases, a reinforcement of fiberglass scrim is used for extra rigidity and greater impact resistance. The effectiveness of a vapor barrier depends on three primary factors: 1) Location within the insulated section 2) Permeance 3) Proper installation Storage Building PlansNo architect or engineer is required to read steel building plans. Although they are technical, they are created so anyone can easily comprehend them. When your steel building package arrives, you will find a wealth of useful information and instructions on building installation. Storage building plans for steel storage buildings show common construction details. The floor plan is displayed so you know what, and in which order to do each task. If you have any difficulties, your steel building manufacturer can easily explain the process. Another important thing you should remember is, since you are an integral part of the building design phase, you should be very familiar with the basic floor plan. But, if you need assistance with building plans, your supplier should explain the layout in a manner more complimentary to your way of thinking. COMMERCIAL OFFICESYour place of business should and can be more than just a place to work. It should reflect your company's image and be no less comfortable, functional or attractive than your living environment. Entry-ways and lighting, interior wall placement, and location of restrooms are as important in your office building as they are in your own home. Properly planned, your facility will serve your needs for many years to come, and you will avoid future changes or costly remodeling. Modern ceiling and interior wall systems are very easily adapted to our manufactured building components using standard methods. For instance, perimeter sheet rock walls may be installed by simply attaching metal furring strips (hat channel) to the secondary wall framing members (girts). Similarly, acoustic panel or dry-wall ceilings may be installed by simply wrapping the ceiling suspension wires around the secondary roof framing members (purlins). Additionally, port-a-wall systems may be installed as needed throughout the structure. Additional loads from heating and air conditioning systems, dropped ceilings, electrical conduit and lighting fixtures, or large mechanical sprinkler systems can be accommodated easily at your request with minimal cost, assuring a full roof-load certification. The building components may represent a small percentage of the total cost of your office budget. Therefore, we are careful to ensure that the main structural components we provide will be reliable, helping to protect your investment against any water seepage, leaks or storm damage that can deteriorate your office complex. When selecting the manufacturer of your building components, careful consideration must be given to both function and price. Your dealer will encourage you to have an architect review all aspects of your building plan, including lighting requirements, window heights, storage space, carpet wear ability, entrances, landscaping, parking and signage, to ensure you of a facility that will maintain its value and be a source of pride for years to come. Thank you for visiting Metal Building for Wedowee, Alabama. We provide the best service and prices when shopping for metal buildings or steel buildings. |