Metal Building for Town Creek, Alabama Build and Buy Online!
Steel FrameMetal buildings are strong. It is the nature of their design. Because they are built to survive the harshest conditions, you can rest assured that you investment will last for years to come. The basic design provides great structural stability, even in an earthquake or windstorm. The rigid steel frame reinforces the secondary structural framing system. Any building is only as good as its foundation. A steel frame is the ultimate starting point for your building. The last thing you need to worry about is the structural integrity of your office, shop or storage buildings. An advantage with pre-engineered buildings is there are no roof shingles for you to worry about replacing later. A smart investment is one that requires the least amount of cost now and in the future. Steel frame buildings are just such an investment. If you have questions about steel frame buildings, just turn to an expert. There are many qualified steel building manufacturers to answer any question that you may have. ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Secondary FramingSecondary framing is created from rolled steel coated with a red-oxide primer finish in gages from 12 to 16 to provide an extremely rigid, and corrosion resistant structure. The following elements are formed as secondary framing: Girts (walls) & Purlins (roof): These members run the length of the building providing rigidity, and a sturdy skeleton to attach the sheeting. They are rolled from steel coils 12,14 or 16-gauge steel, or thicker if needed. All girts and purlins are pre-punched for ease of assembly. Eave Struts: This is a rolled member formed into a "C" to match the pitch of the roof. The eave strut is also made of 12, 14, or 16-gauge steel. Structural FramingAll frames are welded on a state-of-the-art computerized submerged welding system. We are capable of producing structural members up to 72" in depth, which gives us the ability to manufacture clear-span buildings up to 150 feet wide! A factory primer coating is applied to protect the beams during shipping and erection. All framing members shall be shop fabricated for field bolted assembly unless otherwise noted on plans and specifications. All building parts shall carry an identifying mark for easy field identification. Structural framing shall include tapered beam frames, tapered rigid frames, modular beam and columns, lean-to rafters and columns, canopy beams, intermediate columns bearing end frames and end wall columns. Steel used in the fabrication of built-up primary structural members shall have a minimum yield of 50 KSI. Hot rolled primary structural members shall have a minimum yield of 50 KSI. Cold rolled structural members shall have a minimum yield of 55 KSI. Primary framing shall be shop fabricated and include all holes required for attachment of secondary members and bracing. A continuous arc-welding process shall join flanges and webs of built-up welded members. End wall columns and rafters shall be "hot-rolled" built-up "I" or standard "cee" sections. Connections - All field connections shall be bolted. All primary bolted connections shall be furnished with high strength bolts conforming to A.S.T.M. A-325. All secondary bolted connections shall be furnished with machine bolts conforming to A.S.T.M.-A307. Metal Storage BuildingsMetal storage buildings have multiple advantages over wood framed buildings. The upkeep required to maintain wood structures is not an issue with pre engineered steel buildings. Make an investment that will work for you for a lifetime with robust metal storage buildings. A concern with any building is its ability to maintain an acceptable appearance over years. Wooden buildings need repainting and resealing. Metal buildings, rust resistant, and require far less maintenance than conventional structures. Wooden buildings are susceptible to rotting, insects and leaking. If you are storing equipment, livestock or anything of value, these elements are harmful to a conventional structure. Save yourself time and anguish by investing in metal storage buildings with a steel framework and a heavy insulation package. Thank you for visiting Metal Building for Town Creek, Alabama. We provide the best service and prices when shopping for metal buildings or steel buildings. |